About Sarne Engineering Ltd
Expert Engineering Services,
Consulting and Project Management:
Public-Private Partnerships – BOT & PFI Projects:
- Lenders' Technical Advisors (LTA)
- Lenders' Technical Advisors (LTA)
- Risk Assessment
- Project Monitoring and Control – Schedule,
Budget, Quality - Civil Engineering – Management, Supervision
and Coordination:
- Infrastructure
- Structures
- Bridges
Professional Arbitration and Mediation.
Tourism Development Initiatives and Projects through Tourism Engineering
Projects and Clients
344MW Pumped Storage Power Plant, $500M, under construction since 2017.
LTA to Bank Hapoalim in cooperation with STANTEC.
The first BOT toll road in Israel. Central Section, 88 km, $800M, constructed: 1999-2002. LTA to CIT (Canada) and Bank Hapoalim, in cooperation with ARUP (UK).
Northern extension (section 18) constructed: 2007-2009. Expansion and rehabilitation of the central section: since 2008.
LTA to Bank Hapoalim and Netivim.
Design, construction and operation of a public hospital in the city of Ashdod, the 5th largest city in Israel, 60,000 sq.m, $250M, constructed between 2013-2019 (including supplements), in operation since 2017.
LTA to Bank Leumi.
A unified, multi-discipline training center for the Israeli Defense Forces, 250,000 sq.m, $420M, design and construction: 2012-2016. Operation in stages since 2015.
Construction of a PV system on the campus roofs in 2018.
LTA to Bank Hapoalim.
A unified, multi-discipline training center for the Israeli Police, 60,000 sq.m, $140M, constructed: 2012-2014. Operational since 2015.
LTA to Bank Discount and Harel.
870MW Combined Cycle Power Plant, $620M, constructed: 2012-2015.
LTA to Bank Leumi in cooperation with POYRY (Italy).
100M cu.m seawater reverse osmosis plant, $345M, constructed: 2011-2015.
Local LTA to Bank Hapoalim in cooperation with
NT WATERPROS (Cyprus) and BATTUS (UK).
Rehabilitation and Operation of existing roads in Israel, 270 km, $250M, starting from 2010.
LTA to Bank Discount.
Toll road crossing the Haifa metropolitan area with Israel's longest vehicle tunnels and connecting bridges, 2×5.6 km, $220M, constructed: 2007-2010.
LTA to Bank Discount in cooperation with ARUP (UK) – during construction phase.
3 lane expressway that forms the southern part of the Tel Aviv metropolitan ring road, 22 km, $400M, constructed: 2005-2009.
LTA to Bank Hapoalim.
The first Light Rail System in Israel, 14 km, $800M,
constructed: 2006-2011.
LTA to Bank Hapoalim and Bank Leumi.
The Red Line, at grade and underground, the first line of the future Tel Aviv Metropolitan Light Rail System, 22 km with 14.2 km twin tunnels, $2B.
Local LTA to the MLAs (including RBS, KfW, Bayern LB, Bank Leumi), in cooperation with CAPITA SYMONDS (UK).
The largest cargo terminal in Israel, $20M,
constructed: 2005-2007.
LTA to Bank Leumi (Israel).
Main interchange of the Cross-Israel Highway, a preliminary
stage of the BOT project, $50M, constructed: 1996-1999.
Project Management.
The only highway crossing the city of Tel Aviv and connecting
its northern and southern suburbs, 30 km, constructed in parts since 1972.
Structural design management, coordination, supervision, project management and construction management.
Contact Details
Sarne Engineering Ltd. Mailbox: 854 Ra'anana 4310702, ISRAEL
Tel. +972-3-6046002 Fax. +972-9-7461823 Email info@sarne-eng.co.il
David Sarne: Mobile +972-50-5248137 Email david@sarne-eng.co.il
Mickey Sarne: Mobile +972-50-4711776 Email mickey@sarne-eng.co.il